Welcome to Taiwan WAYTRAIN sawing machine sales service center!
XIE ZHONG
Taiwan WAYTRAIN sawing machine sales service center!
400-8328-098
Contact US

Guangdong Association Public Intelligent Technology Co., Ltd.
Tel. :  +86-0769-8287-9459

+86-136 3176 9379

+86-134 5002 8260
Fax. :  +86-0769-8902-6009
E-mail : 13631769379@139.com
After-sales service: 400-8328-098


Current Location:News Center > Industry News > Text

Preparation of sawing machine test machine

Source:Release Time:2017-11-02 10:04:29Click Rate:

1, open the fuel tank cap in front of sawing machine, add 32 , (46 summer wear-resistant hydraulic oil, the oil level to the high filter is limited ...

L M S

1, open the fuel tank cap in front of sawing machine, add 32 #, (46 # summer wear-resistant hydraulic oil, the oil level to the high filter is limited.

2, add water, water level to the bed after the pump suction port upper limit.

3, close the circuit breaker switch, unscrew the total stop switch, pump switch operation, turn the speed control switch counterclockwise to the slowest position, open the rise switch. Let the sawing machine beam up to the highest position, and then open the operation switch, saw switch pulley operation, counterclockwise rotation is forward. After the test run, the total stop switch.

4, open the saw belt wheel guard, hang the saw blade, the saw blade must rely on the upper edge of the pulley.

5, the saw blade into the guide head, screwed pull the hand wheel, tensioning saw blade, saw blade tension tight to the hand pressure inelastic so far.

6, according to the width of the workpiece, adjust the left guide arm, right guide arm can not move, the factory has been adjusted, the guide head away from the workpiece 20mm for the best.

7, open the rotary valve ⒁ to release the file, put the workpiece into the workpiece quickly turn file, the workpiece quickly. Nine, open the operation switch, saw wheel rotation, rotate the speed switch, adjust the saw feed speed (the new saw blade can not be too fast, to be run in for some time before adding the sawing speed).

8, according to the fast down valve, the saw frame to reduce rapidly until the saw blade near the workpiece to stop, the beginning of feed sawing, sawing the end of sawing belt to take the initiative to suspend, and saw the initiative to rise.

Recommended InformationMORE+  
Guangdong Xiezhong Intelligent Technology Co., Ltd. Copyright © Copyright 2017
Tel.: +86400-8328-098  +860769-8287-9459  +8613631769379
Add.: Liaobu Town, Dongguan City, Fu Dong Si Lane on the 16th floor lobby

二维码